top of page
  • Writer's pictureBona House Materials

Clean room testing

The construction of clean room project is a kind of complex project, because the construction quality of cleanroom project directly determines the purification degree and cleanliness in the workshop, so the requirements and regulations are imposed strictly by the country government and the construction industry for the clean room projects. And the cleanroom is a systematic project, in which the detailed operation and requirements of any step will affect the air cleanliness.


With the steady and common development of all professions including medicine, biotechnology, production of precision electronic equipment, food, cosmetics and so on. As these industries grow, clean room procedure are required to become more standardized, and clean room testing is also more and more important.

Here will introduce you the follow-up clean room testing method.


1. Verify the functionality of the main power switch.


2. Regularly check whether the emergency switch is open.


3. The power supply of air supply switch must be opened first.


4. Activate the electrostatic dust collector and exhaust fan switches.


5. the exhaust system must be closed before the air supply system closed, otherwise the negative pressure will affect the environment of the dust-free workshop.


Through the above testing process of the clean room project, we believe you will have a certain understanding of it. The intention of the clean room workshop project is to purify the air and optimize the production environment.


clean room testing

Except the clean room testing to be done after the clean room construction in order to keep a normal operation. Regular maintenance is also necessary to ensure a optimal performance. Training to personnel involved in operating and maintaining the purification system is suggested and records of inspection and maintenance to manage a effective clean room workshop.

2 views0 comments

Comments


bottom of page